The roof is in place and work is underway on the interior.

21. 20 Feb 2015

The second and third photos below show the worship space/hall, front and back.  Behind the wall at the back, the batons are being put in place for the interior walls to the kitchen, toilets and storage.26. 20 Feb 2015